ag电子逍遥博网

 
SPU one-component polyurethane waterproof coating
JFK11 polymer cement-based composite waterproof material
PU color polyurethane waterproof coating
PU polyurethane waterproof coating 911, 991
858-LJP color polymer waterproof coating
JS polymer cement waterproof coating
Cement-based penetrating crystalline waterproof coating
Your current location : Home> Products
JS polymer cement waterproof coating
JS polymer cement waterproof coating is a two-component environment-friendly waterproof coating compounded by polymer emulsion and inorganic powder. It has the characteristics of high strength of cement-based cementitious materials, easy adhesion to wet base surfaces, and high elasticity of polymer coatings and excellent waterproof performance. It can also be formulated into color paints. It is widely used in waterproofing of old and new roofs, underground projects, toilets, bathrooms, kitchens, and external walls.
Technical indicators:
project
Type I
Type II
Solid content
≥65%
Drying time
Surface dry
≤4h
Hard work
≤8h
Tensile Strength
≥1.2Mpa
≥1.8Mpa
Elongation at break
≥200%
≥80%
Low temperature flexibility
Freeze at -10 ℃ for 2h, bend around φ100mm round rod without crack
-
Impermeability 0.3Mpa 30Min
impermeable
-
Wet base surface bonding strength
-≥0.5Mpa
≥1.0Mpa
Impermeability (backwater surface)
-
≥0.5Mpa
Ingredients:
After the liquid material is stirred evenly, add the powder material to the liquid material slowly while stirring according to the weight ratio of liquid: powder = 10: 7 (type Ⅰ) and liquid: powder = (type Ⅱ), until the coating is not stirred. Granules, stirring time is about 5-8 minutes, the primer coating can be diluted with a small amount of water, the prepared coating should be used up within 20min to 60min according to the temperature.
Construction method:
1. The surface of the grassroots is required to be level and free of debris such as sand and floating ash. Construction can be performed on a wet base, but the water content should not exceed 15%.
2. The construction sequence is yin and yang corner, gutter, and plane.
3. The brushing, rolling, scraping and other methods are used in the construction. The first construction is required to be thinner. After the coating is dried, the glass fiber cloth or non-woven fabric is laid. Can only be done later.
Storage, transportation and packaging:
1. Stored in a cool and dry place indoors, the storage temperature is 0 ℃ ~ 40 ℃. The storage period is half a year.
2. The paint is transported as non-dangerous goods.
3. The liquid material of this product is packed in plastic drum or iron drum, and the powder is packed in carton.
Precautions
1. Construction should not be carried out when the temperature is below 0 ° C.
2. Construction is prohibited in rain and snow.
3. The coating should be fully stirred before use.
Copyright ? 2010 ahjiafu.com All right reserved.
Copyright: Shengzhou Haosha Building Waterproof Co., Ltd. Address: Sanjie Industrial Park, Shengzhou, Zhejiang, China
最准的北京赛车计划 极速赛车pk10二维码大全 pc信誉微信群 澳门美高梅官网登入 北京赛车投注微信群 788彩票网注册网址 正规的彩票软件 飞艇微信群赛车群公众号 尊尼彩票登录 手机捕鱼游戏